Sign In | Join Free | My himfr.com
Home > Steel Frame Building Construction >

H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction

Qingdao Yidongxiang Steel Structure Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction from wholesalers
     
    Buy cheap H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction from wholesalers
    • Buy cheap H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction from wholesalers
    • Buy cheap H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction from wholesalers
    • Buy cheap H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction from wholesalers
    • Buy cheap H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction from wholesalers
    • Buy cheap H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction from wholesalers
    • Buy cheap H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction from wholesalers
    • Buy cheap H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction from wholesalers

    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction

    Ask Lasest Price
    Brand Name : YDX
    Model Number : YDX123
    Certification : ISO,BV.SGS,CE
    Price : USD760/TON
    Payment Terms : L/C,T/T,Western Union,MoneyGram
    Supply Ability : 10000TON/MONTH
    Delivery Time : 35 DAYS
    • Product Details
    • Company Profile

    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction

    Pre engineering building material steel structure warehouse


    1. Free to design architectural drawings for you;
    2. Features: Fast and flexible to assemble, safe, thermal and noise insulation, water proof and fire prevention;
    3. Cost-effective: Fast and easy installation greatly shorten the construction time which reduce the costs;
    4. Durability: The whole structure is easy in maintenance, which can be used for more than 50 years.
    5. Perfect design: Perfect design completely avoids leaks and water seepage. Meanwhile, it's also in line with the national level of fire prevention.
    6. Carrying capacity: can resists the impact of strong wind and seismic
    performance and bears heavy snow loads

    Steel structure Design Low Carbon Food Plant Steel Structure warehouse


    BaseCement and steel foundation bolt
    Main frameH beam
    MaterialQ235B, Q345B or others as buyers' requests
    PurlinC or Z purlin: Size from C120~C320, Z100~Z20
    BracingX-type or other type bracing made from angle, round pipe
    BoltPlain bolt and High-strength bolt
    Roof & wallSandwich panel or color plate
    DoorSliding or rolling door
    WindowAluminium alloy window
    SurfaceTwo times of Anti-rust Painting or Hot Dip Galvanized
    Sheet0.5mm or 0.6mm galvanized sheet
    AccessoriesSemi-transparent skylight belts, Ventilators,down pipe, galvanized gutter, etc



    After the laying is completed, find the rules for the anchor bolts. Strictly position according to the axis and elevation provided.

    Find the rules: It is required that all anchor bolts are aligned and the steel columns are placed in a straight line.


    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction

    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction


    When hoisting steel columns, the foundation nuts should be leveled in advance. During hoisting, no one is allowed to stand within the lifting range of the crane. After the steel columns are basically in place, people should install them. The anchor nut should be tightened.


    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction


    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction

    Lifting of steel beams after assembly: After the construction of steel column tie rods/column supports is completed, the steel beams will be lifted

    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction

    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction


    Tie rod connection between steel beams: must achieve bolt tightening and consistent direction

    The roof steel beams use high-strength bolts and do not require welding.

    Platform beams are divided into main beams and secondary beams: the main beams are generally welded, and the wing plates are welded. Secondary beams are generally not welded.


    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction



    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction


    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction


    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction

    Roof inner panel completed


    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction


    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction


    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction


    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction


    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction


    Finished photo


    H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction




    Quality H Beam Pre Engineering Steel Building Steel Structure Industrial Warehouse Construction for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Qingdao Yidongxiang Steel Structure Co., Ltd.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)